Warehouse – External Development / Internal Renovation
The access ramp was not accessible to the forklift trucks due to the angle of the ramp.
Oaks Property Services added a longer ramp with a shallower gradient to ensure full accessibility
The project involved internal racks for the entire warehouse for pallet storage, creation of a driver office on the ground floor and three separate offices on the first floor. All offices were then decorated and carpeted. We also added two additional kitchenettes.
The boiler was removed and replaced with a new electric water heater.




